PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed metal decking at Stairs -2 (Roof) Facing East (800x600).jpg Installed wire mesh for the slab on grade at the Monumental Stairs Facing East (800x600).jpg Layed out the embeds and couplers around the 4th Floor Facing West (800x600).jpg Started installing nelson studs at the 2nd floor metal decking Facing West (800x600).jpg Prepping for the slab on grade at the trench drains Facing North (800x600).jpg
Previous page Prepping for the slab on grade at the trench drains Facing North (800x600)
Prepping for the slab on grade at the trench drains Facing North (800x600)